Connect the CommLink to the J35 with the CAN bus cable. Then connect the ControlNode to the CommLink. Then connect the battery monitor to the ControlNode.
This way, the battery monitor is daisy-chained to the J35 through the ControlNode and CommLink.
Comments
0 comments
Please sign in to leave a comment.